Published By Army Corps of Engineers, Department of the Army, Department of Defense
Issued over 9 years ago
Summary
Description
There are three tasks associated with this delivery order: Task 1: Elevations of the Low Steel for bridge superstructures on the following rivers: St. Croix between river miles 0 - 24 (05 bridges) Mississippi between river miles 634 - 858 (39 bridges) Minnesota between river miles 1 - 15 (05 bridges) Black between river miles 1 - 2 (01 bridges) Total =50 Task 2: Elevations of the Lowest Sag Point of Overhead cables and extents/locations of supporting pylons on the following rivers: St. Croix between river miles 8 - 22 (04 O/H Cables) Mississippi between river miles 678 - 858 (26 O/H Cables) Minnesota between river miles 0 - 15 (09 O/H Cables) Black between river miles 0 - 1 (01 O/H Cables) Total = 40 Task 3: Collection of Navigation features and RAW Point Cloud of specified Lock and Dams on the following river: Mississippi between river miles 615 - 854 (13 Lock & Dams) The navigation features to be collected are Lock Guidewall, Lock Chamber and Lock Gates. Additionally, the RAW point cloud shall be collected for all accessible areas of the specified Lock and Dams. The total number of structures is 103. See attachment A for a detailed list of structures.